5.1 Name TWO methods that are used to channel storm water away from buildings. 5.2 Who is responsible for the disposal (removal) of storm water from a property? 5.... show full transcript

Worked Solution & Example Answer:5.1 Name TWO methods that are used to channel storm water away from buildings - NSC Civil Technology Civil Services - Question 5 - 2020 - Paper 1

Step 1

Name TWO methods that are used to channel storm water away from buildings.

96%

114 rated

Answer

  1. Gutters on roofs collect rainwater and direct it to downpipes.
  2. Channels on inclined surfaces can lead water away from buildings.

Step 2

Who is responsible for the disposal (removal) of storm water from a property?

99%

104 rated

Answer

The owner of the property is responsible for the disposal of storm water.

Step 3

Explain the purpose of a road kerb.

96%

101 rated

Answer

The purpose of a road kerb is to manage storm water by directing it into storm water drains, helping to prevent flooding and erosion.

Step 4

Draw a neat freehand sketch, in good proportion, in your ANSWER BOOK of the development of the stop end that will fit on a 125 mm x 80 mm box gutter.

98%

120 rated

Answer

In the sketch, ensure that the stop end has dimensions of 125 mm x 40 mm for the sides, 80 mm for the base, and a 40 mm width on the stop end sides. Indicate clear seams.

Step 5

Explain why a stop end is used when installing gutters.

97%

117 rated

Answer

Stop ends are used to seal the gutter at the ends, preventing water from flowing out at those points and ensuring efficient water management.

Step 6

Name ONE material that can be used for flashing.

97%

121 rated

Answer

Copper is a common material that can be used for flashing.

Step 7

ANSWER SHEET 5.7 shows the front view and top view of a square-based truncated pyramid. Use the drawing and information to draw the development of the pyramid.

96%

114 rated

Answer

Start by marking the apex, determining the true length of slants. Develop arcs for the top and bottom bases as per dimensions, and ensure a 5 mm seam is incorporated in all constructions.