Photo AI

1.1 Choose a description from COLUMN B that matches an item in COLUMN A - NSC Civil Technology Civil Services - Question 1 - 2019 - Paper 1

Question icon

Question 1

1.1-Choose-a-description-from-COLUMN-B-that-matches-an-item-in-COLUMN-A-NSC Civil Technology Civil Services-Question 1-2019-Paper 1.png

1.1 Choose a description from COLUMN B that matches an item in COLUMN A. Write only the letter (A–K) next to the question numbers (1.1.1 to 1.1.8) in the ANSWER BOO... show full transcript

Worked Solution & Example Answer:1.1 Choose a description from COLUMN B that matches an item in COLUMN A - NSC Civil Technology Civil Services - Question 1 - 2019 - Paper 1

Step 1

1.1.1 PVA paint

96%

114 rated

Answer

B - can be applied to walls.

Step 2

1.1.2 Guard rail

99%

104 rated

Answer

A - method of finishing metal exposed to heavy and wet conditions.

Step 3

1.1.3 Powder coating

96%

101 rated

Answer

C - keeps runs free from oil and grease.

Step 4

1.1.4 Builder's hoist

98%

120 rated

Answer

D - light material used in the manufacturing of door and window frames.

Step 5

1.1.5 Ladder

97%

117 rated

Answer

H - gates should always be kept shut when the device is being used.

Step 6

1.1.6 Diagonal brace

97%

121 rated

Answer

G - transports workers, materials and equipment between ground and upper levels.

Step 7

1.1.7 Galvanising

96%

114 rated

Answer

J - zinc coating applied to the base of metal.

Step 8

1.1.8 Chute

99%

104 rated

Answer

E - used as a means to dispose of waste material and debris from elevated areas.

Step 9

1.2 Explain TWO advantages of electroplating.

96%

101 rated

Answer

Electroplating protects metals against corrosion, enhancing their durability. It also improves the engineering and mechanical properties of metal parts, making them more robust.

Step 10

1.3 Name the process when freshly cast concrete is kept moist for a specific period of time.

98%

120 rated

Answer

Curing.

Step 11

1.4 Explain the purpose of keeping freshly cast concrete moist.

97%

117 rated

Answer

Keeping freshly cast concrete moist prevents it from drying too quickly, which could lead to cracking. It ensures proper hydration, promoting strength and durability.

Step 12

1.5 Describe TWO safety precautions for transporting materials.

97%

121 rated

Answer

When transporting materials, ensure they are securely loaded to prevent shifting. Also, maintain a safe distance from other workers to avoid accidents.

Step 13

1.6 Describe ONE safety factor for scaffold planks.

96%

114 rated

Answer

Scaffold planks should be able to support the load they bear to prevent failures that could lead to injuries.

Step 14

1.7.1 Identify the tool above.

99%

104 rated

Answer

The tool is a dumpy level.

Step 15

1.7.2 Predict ONE consequence if the instrument is NOT set level.

96%

101 rated

Answer

If the instrument is not set level, it will give inaccurate readings.

Step 16

1.8.1 Identify the joining fixture above.

98%

120 rated

Answer

The joining fixture is a plug/rawl plug.

Step 17

1.8.2 Name the fixing agent that should be used with this joining fixture.

97%

117 rated

Answer

A screw.

Step 18

1.8.3 Explain ONE use of this joining fixture.

97%

121 rated

Answer

This joining fixture is used to secure objects against walls or similar materials.

Join the NSC students using SimpleStudy...

97% of Students

Report Improved Results

98% of Students

Recommend to friends

100,000+

Students Supported

1 Million+

Questions answered

;