3.1 Choose a description from COLUMN B that matches an item in COLUMN A - NSC Civil Technology Civil Services - Question 3 - 2016 - Paper 1
Question 3
3.1 Choose a description from COLUMN B that matches an item in COLUMN A. Write only the letter (A–G) next to the question number, for example 3.1.5 H.
COLUMN A COLU... show full transcript
Worked Solution & Example Answer:3.1 Choose a description from COLUMN B that matches an item in COLUMN A - NSC Civil Technology Civil Services - Question 3 - 2016 - Paper 1
Step 1
Choose a description from COLUMN B that matches an item in COLUMN A.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
3.1.1: B
3.1.2: E
3.1.3: D
3.1.4: C
3.1.5: A
Step 2
Name any THREE materials that are used for the manufacture of pipes for a cold-water installation.
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
PVC pipe
Copper pipe
Galvanized pipe
Step 3
Explain the purpose of A.
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
A is designed to provide water to the tap.
Step 4
Explain the function of cap B on the pipe bend.
98%
120 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Cap B is removable to provide access to the inside of the pipe.
Step 5
Identify pipe C.
97%
117 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Pipe C is a waste water pipe or PVC pipe.
Step 6
State the diameter of pipe C.
97%
121 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The diameter of pipe C is 40 mm/50 mm.
Step 7
Explain the purpose of D.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
D is used to anchor the pipe to the wall.
Step 8
Explain why you would fix a 45° PVC bend (E) at the end of pipe C.
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
E is used to guide the wastewater directly into the gully.
Step 9
State the diameter of pipe F.
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The diameter of pipe F is 100 mm interior/110 mm exterior.
Step 10
Describe the purpose of the water at G.
98%
120 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The purpose of the water at G is to form a water seal/water trap/water lock to prevent bad odours and gasses from the sewer entering back into the building.
Step 11
Identify part H.
97%
117 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Part H is the P-trap.
Step 12
Identify the following symbols as used in civil services.
97%
121 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
3.4.1: Wash tub
3.4.2: Sewer line/drain pipes
3.4.3: Safety valve
3.4.4: Storm water drain pipes
Step 13
Give TWO reasons why wastewater may not be channelled into a septic tank.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
It contains chemicals that are poisonous to the bacteria in the tank.
The tank will fill up quickly and block the system.
Step 14
Write the correct name of the part next to the letter (A–G) in the ANSWER BOOK.
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
A: Stopcock
B: Pressure control valve
C: Vacuum breaker
D: Drain cock/Cold water inlet
E: Drip tray
F: Safety valve/Hot water outlet
G: Hot water cylinder/Geyser