Photo AI

3.1 Change the underlined word(s) in the following to make the statements correct - NSC Civil Technology Civil Services - Question 3 - 2024 - Paper 1

Question icon

Question 3

3.1-Change-the-underlined-word(s)-in-the-following-to-make-the-statements-correct-NSC Civil Technology Civil Services-Question 3-2024-Paper 1.png

3.1 Change the underlined word(s) in the following to make the statements correct. Write the appropriate word(s) next to the question numbers (3.1.1 to 3.1.5) in the... show full transcript

Worked Solution & Example Answer:3.1 Change the underlined word(s) in the following to make the statements correct - NSC Civil Technology Civil Services - Question 3 - 2024 - Paper 1

Step 1

3.1.1 The slope at which a 225 mm diameter pipe should be laid is

96%

114 rated

Answer

The slope at which a 225 mm diameter pipe should be laid is 1 : 60.

Step 2

3.1.2 The recommended thickness of layers for backfilling is

99%

104 rated

Answer

The recommended thickness of layers for backfilling is 150 mm.

Step 3

3.1.3 The OSS specifies that all excavation work should be carried out

96%

101 rated

Answer

The OSS specifies that all excavation work should be carried out under supervision.

Step 4

3.1.4 At excavations,

98%

120 rated

Answer

At excavations, orange/red warning signals must be visible at all times.

Step 5

3.1.5 Where soil is moderately firm,

97%

117 rated

Answer

Where soil is moderately firm, the vertical members of shoring should be placed loose/waterlogged.

Step 6

3.2 Explain the process of soil compaction.

97%

121 rated

Answer

Soil compaction is the process of increasing the density of soil by pressing the soil particles closer together. This is achieved through various methods such as mechanical compaction, where equipment like rollers or vibratory plates are used to compress the soil, or by adding moisture to facilitate consolidation.

Step 7

3.3 Describe TWO precautionary measures that will allow a worker to work in an excavated trench.

96%

114 rated

Answer

  • The sides of the excavation must be properly supported: This prevents soil collapse that can trap workers.
  • The supervisor must ensure that no load, material or heavy machinery is placed near the edge of any excavation: This reduces the risk of cave-ins and unsafe working conditions.

Step 8

3.4.1 Pipe carrying mixed (temperature) water

99%

104 rated

Answer

3.4.1: Cross linked polyethylene (XLP).

Step 9

3.4.2

96%

101 rated

Answer

3.4.2: Pex-pipe.

Step 10

3.4.3

98%

120 rated

Answer

3.4.3: Copper.

Step 11

3.4.4

97%

117 rated

Answer

3.4.4: Hot-water pipe.

Step 12

3.4.5

97%

121 rated

Answer

3.4.5: Mixer tap.

Step 13

3.4.6

96%

114 rated

Answer

3.4.6: Chrome/Brass.

Step 14

3.4.7

99%

104 rated

Answer

3.4.7: 90° Elbow.

Step 15

3.5 Calculate the fall of the drainpipe between point A and B

96%

101 rated

Answer

To calculate the fall of the drainpipe:

  • Length of pipe = 5000 mm
  • Fall of drainpipe = rac{1}{60} imes 5,000 = 83.3 mm
    This gives a fall of 83.3 mm or 0.083 m.

Step 16

3.6 Name TWO tools that are used to set out the fall for a trench over a short distance.

98%

120 rated

Answer

  • Spirit level
  • Dumpy level.

Step 17

3.7 Name ONE member that forms part of a temporary structure that is used.

97%

117 rated

Answer

Polling boards.

Join the NSC students using SimpleStudy...

97% of Students

Report Improved Results

98% of Students

Recommend to friends

100,000+

Students Supported

1 Million+

Questions answered

;