Photo AI

5.1 FIGURE 5.1 below shows a pre-fabricated surface channel A and concrete shoe B - NSC Civil Technology Civil Services - Question 5 - 2022 - Paper 1

Question icon

Question 5

5.1-FIGURE-5.1-below-shows-a-pre-fabricated-surface-channel-A-and-concrete-shoe-B-NSC Civil Technology Civil Services-Question 5-2022-Paper 1.png

5.1 FIGURE 5.1 below shows a pre-fabricated surface channel A and concrete shoe B. 5.1.1 Explain why reinforced concrete is preferred in the manufacturing of A. 5.... show full transcript

Worked Solution & Example Answer:5.1 FIGURE 5.1 below shows a pre-fabricated surface channel A and concrete shoe B - NSC Civil Technology Civil Services - Question 5 - 2022 - Paper 1

Step 1

5.1.1 Explain why reinforced concrete is preferred in the manufacturing of A.

96%

114 rated

Answer

Reinforced concrete is favored in the manufacturing of pre-fabricated surface channel A for several reasons:

  1. Strength: Reinforced concrete is stronger than mass concrete, allowing it to bear heavier loads and resist wear over time.

  2. Durability: It withstands significant forces from water flow, making it ideal for channels that often deal with heavy rainfall or liquid transport.

  3. Hydraulic Efficiency: Reinforced concrete is designed to handle large volumes of water flow efficiently, preventing overflow and reducing the risk of structural damage.

Step 2

5.1.2 Describe the logic for having a fall/slope when positioning B.

99%

104 rated

Answer

The concrete shoe B must be positioned with a fall or slope to ensure:

  1. Water Drainage: It facilitates the effective drainage of water away from the building, preventing water accumulation that could lead to structural damage.
  2. Preventing Water Damage: A correct slope minimizes the risk of water pooling, which can cause erosion or deterioration of the concrete over time.

Step 3

5.2 Use this answer sheet and complete the fascia board, gutter and downpipe installation.

96%

101 rated

Answer

In constructing the roof's fascia board, gutter, and downpipe, the following elements are essential:

  1. Fascia Board: Begin by sketching the fascia board, ensuring it's connected securely to the roof structure.
  2. Square Gutter: Draw the square gutter, integrating it with clip supports and ensuring correct alignment with the fascia board's edge.
  3. Gutter Clip: Indicate the gutter clips that secure the gutter in place.
  4. Offset: Create an offset at the point where the gutter transitions to the downpipe for proper angle and flow.
  5. Downpipe: Position the downpipe with a smooth transition from the gutter, ensuring it directs water away from the building's foundation.
  6. Holder Bats: Include holder bats that support the downpipe placement.
  7. Rainwater Shoe: Finally, show the rainwater shoe connection at the base of the downpipe to guide water efficiently into drainage.

Step 4

5.3 Use the drawing and the information to draw the development of pipe A.

98%

120 rated

Answer

To develop pipe A, follow these steps:

  1. Dividing the Circle: Divide the circle of the auxiliary view into 12 equal parts to determine measurement points for development.
  2. Projection Lines: From each division, project vertical lines downward to establish the length of each section in the development.
  3. Drawing the Development: Considering the pipe's diameter and curved nature, construct the development layout resulting in a flat pattern that maintains accurate proportions for each segment.
  4. 3 mm Seam: Ensure to include the 3 mm seam on both sides of the development, as this is essential for proper assembly.
  5. Final Touches: Clearly label all lines, including construction lines, to enhance understanding and facilitate accurate assembly.

Join the NSC students using SimpleStudy...

97% of Students

Report Improved Results

98% of Students

Recommend to friends

100,000+

Students Supported

1 Million+

Questions answered

;