Photo AI

6.1 Describe the process of joining a capillary elbow to a copper pipe with solder - NSC Civil Technology Civil Services - Question 6 - 2023 - Paper 1

Question icon

Question 6

6.1-Describe-the-process-of-joining-a-capillary-elbow-to-a-copper-pipe-with-solder-NSC Civil Technology Civil Services-Question 6-2023-Paper 1.png

6.1 Describe the process of joining a capillary elbow to a copper pipe with solder. 6.2 Name TWO uses of a spring toggle fixer. 6.3 Describe TWO characteristics of... show full transcript

Worked Solution & Example Answer:6.1 Describe the process of joining a capillary elbow to a copper pipe with solder - NSC Civil Technology Civil Services - Question 6 - 2023 - Paper 1

Step 1

Describe the process of joining a capillary elbow to a copper pipe with solder.

96%

114 rated

Answer

The process of joining a capillary elbow to a copper pipe using solder involves several steps:

  1. Preparation of the surfaces: Start by cleaning the ends of the copper pipe and the inside of the elbow using sandpaper, steel wool, or a similar abrasive to remove any oxidation or dirt.
  2. Applying flux: Next, apply a suitable flux to the cleaned surfaces. The flux helps to prevent oxidation during heating and allows for better flow of the solder.
  3. Joining the pieces: Insert the copper pipe into the elbow joint.
  4. Heating the joint: Use a propane torch to evenly heat the joint until the solder flows. It is important to heat the pipe and elbow but not to apply solder directly to the flame.
  5. Applying solder: Once the joint is hot enough, apply the solder around the joint, allowing it to flow into the gaps and create a strong bond as it cools.

Step 2

Name TWO uses of a spring toggle fixer.

99%

104 rated

Answer

  1. Fixing brackets and frames: Spring toggle fixers are commonly used to attach brackets, timber, and small frames against plasterboard or hollow-wall applications. They provide a secure hold in these materials.
  2. Hanging light fixtures: They can also be employed to hang lights and chandeliers to the ceiling, supporting significant weight efficiently.

Step 3

Describe TWO characteristics of cast-iron pipes in terms of its strength and corrosion.

96%

101 rated

Answer

  1. Superior Strength: Cast-iron pipes possess a higher tensile strength when compared to other piping materials, making them resistant to high pressure and suitable for various applications.
  2. Corrosion Resistance: While cast-iron pipes are susceptible to corrosion, they often come with additional protective coatings to prolong their lifespan and maintain structural integrity.

Step 4

Name the type of test.

98%

120 rated

Answer

The type of test being conducted is known as a leak test.

Step 5

Identify/measuring device A.

97%

117 rated

Answer

Device A is a manometer.

Step 6

Identify the component in the encircled part B.

97%

121 rated

Answer

The component in the encircled part B is a drain stopper/stopper.

Step 7

Describe the first THREE steps of how you would conduct the test.

96%

114 rated

Answer

  1. Seal all openings: Ensure all openings in the pipes are sealed with stoppers to prevent any escape of air or water.
  2. Connect the manometer: Attach the manometer to the test section of the pipeline, ensuring it is securely fitted.
  3. Introduce a pressure source: Apply air pressure to the system until it reaches specified levels, ensuring that all connections are airtight.

Step 8

Explain the result if the reading starts to drop.

99%

104 rated

Answer

If the reading on the manometer begins to drop, it indicates that there is a leak in the system. This means that air is escaping from the pipeline, and it is essential to locate and repair the leak before proceeding with further testing.

Step 9

Explain ONE reason for constructing a manhole ramp.

96%

101 rated

Answer

A manhole ramp is constructed to facilitate access for maintenance personnel and equipment. When the ground slopes slightly away from the connection point, the ramp allows for safe and easy entry into the manhole without the risk of falling.

Step 10

Describe TWO advantages of a manhole ramp.

98%

120 rated

Answer

  1. Safety during access: The ramp provides a stable and secure way for technicians to enter and exit the manhole, reducing the risk of accidents.
  2. Pressure relieve: In the event of a blockage, the manhole ramp helps to keep the waste material at a manageable level by storing it temporarily, preventing backflow and overflows.

Step 11

Differentiates by means of sketches between a P-trap and an S-trap for a gully filled with water. Indicate the water levels in your sketches.

97%

117 rated

Answer

A P-trap can be identified by its shape resembling the letter 'P' which traps water in the bend, preventing sewer gases from escaping. The water level would typically be maintained at a standard level, aiding in odor control. An S-trap, on the other hand, resembles the letter 'S' and also traps water similarly, but can be prone to siphonage and thus requires careful design to maintain water levels and control odor effectively.

Step 12

Write down the abbreviation of component A.

97%

121 rated

Answer

The abbreviation of component A is RE.

Step 13

Explain how you would correct the connection at B of the drainage plan.

96%

114 rated

Answer

To correct the connection at B of the drainage plan, I would ensure that a proper 45° or 135° bend is used to connect the sewer lines appropriately. This would help to maintain proper flow and prevent blockages.

Step 14

Identify component C.

99%

104 rated

Answer

Component C is the ventilation pipe or vent valve.

Step 15

Name the component that must be installed at D to receive water from the manhole.

96%

101 rated

Answer

The component that must be installed at D to receive water from the manhole is a municipal connection.

Step 16

Name the prescribed angle for the pipe at E.

98%

120 rated

Answer

The prescribed angle for the pipe at E is typically 45° or 135°.

Step 17

Describe the fault at F.

97%

117 rated

Answer

The fault at F indicates that the branch pipe runs through or into the wall, which could lead to issues with drainage as well as structural integrity. Adjustments should be made to ensure proper alignment and flow.

Step 18

Use ANSWER SHEET 6.8 to draw the completed sectional view of the vacuum tank with the draw-off valve. Print any TWO labels.

97%

121 rated

Answer

To complete the sectional view of the vacuum tank:

  1. Draw the tank with clear demarcation for the draw-off valve.
  2. Label the tank body and specify the draw-off valve. Ensure all dimensions are indicated accurately as per the specifications.

Join the NSC students using SimpleStudy...

97% of Students

Report Improved Results

98% of Students

Recommend to friends

100,000+

Students Supported

1 Million+

Questions answered

;