3.1 State TWO methods that are used to prevent inhaling dangerous fumes in a manhole - NSC Civil Technology Civil Services - Question 3 - 2021 - Paper 1

Question icon

Question 3

3.1-State-TWO-methods-that-are-used-to-prevent-inhaling-dangerous-fumes-in-a-manhole-NSC Civil Technology Civil Services-Question 3-2021-Paper 1.png

3.1 State TWO methods that are used to prevent inhaling dangerous fumes in a manhole. 3.2 Describe TWO aspects that must be determined when setting out and excavati... show full transcript

Worked Solution & Example Answer:3.1 State TWO methods that are used to prevent inhaling dangerous fumes in a manhole - NSC Civil Technology Civil Services - Question 3 - 2021 - Paper 1

Step 1

State TWO methods that are used to prevent inhaling dangerous fumes in a manhole.

96%

114 rated

Answer

  1. Wear a respiratory mask: This ensures that harmful fumes are not inhaled directly.
  2. Use an extractor fan to remove the fumes: This method helps ventilate the area and reduce the concentration of dangerous gases.

Step 2

Describe TWO aspects that must be determined when setting out and excavating a trench for sewer pipes.

99%

104 rated

Answer

  1. The slope of the trench: It is crucial to determine the slope to ensure proper drainage and flow of sewage.
  2. Invert levels: These must be correctly set out and verified to ensure that the pipes are at the appropriate depth and slope.

Step 3

Name the member that keeps the poling boards apart when the shoring for a trench is set up.

96%

101 rated

Answer

The member is called a strut, which helps maintain space between the poling boards, ensuring stability during excavation.

Step 4

Identify the type of manhole.

98%

120 rated

Answer

The type of manhole shown in FIGURE 3.4 is a concrete ring manhole.

Step 5

Name ONE manhole accessory that is needed in the construction of the manhole in FIGURE 3.4.

97%

117 rated

Answer

One necessary accessory is a manhole cover.

Step 6

Describe the process for installing the base of the manhole in FIGURE 3.4 in chronological order.

97%

121 rated

Answer

  1. Excavate the hole: Begin by excavating the site, ensuring it is at least 300 mm wider than the manhole.
  2. Allow for depth: Ensure there is extra depth for the thickness of the base, below the invert level of the drain.
  3. Cast the concrete base: Once the excavation is complete, pour and set the concrete to form the base of the manhole.

Step 7

State ONE condition according to the OHS building regulations, under which the slope of cuttings in permanent excavations can be vertical.

96%

114 rated

Answer

The slope of cuttings can be vertical if the ground conditions are sound, specifically if the soil is intact rock.

Step 8

Explain TWO regulations regarding permanent excavations.

99%

104 rated

Answer

  1. Steepness of slopes: The slope of cuttings in excavations shall not be steeper than 1:2 to prevent collapsing.
  2. Water control: The excavation must be sloped so that no water ponds within 3 m of the toe of the cutting.

Step 9

Calculate the number of bricks required for the manhole using the specifications listed below:

96%

101 rated

Answer

  1. Determine the area of walls: The centre line length is 6.22 m, and the height is 1.2 m which gives an area of approximately 7.46 m².
  2. Calculate bricks per area: At 50 bricks per m², the total required is: extTotalbricks=extAreaimesextBricksperm2=7.46imes50=373 ext{Total bricks} = ext{Area} imes ext{Bricks per m²} = 7.46 imes 50 = 373 Thus, we would need approximately 373 bricks to construct the manhole.