Make neat sketches to illustrate the following symbols: 6.2.1 Water closet 6.2.2 Sink 6.2.3 Water meter 6.3 In which working drawing is the entrance to a site indicated? 6.4 FIGURE 6.4 on SHEET D shows the floor plan of a store room on scale 1 : 50 - NSC Civil Technology Construction - Question 6 - 2017 - Paper 1

Question icon

Question 6

Make-neat-sketches-to-illustrate-the-following-symbols:--6.2.1-Water-closet--6.2.2-Sink--6.2.3-Water-meter--6.3-In-which-working-drawing-is-the-entrance-to-a-site-indicated?--6.4-FIGURE-6.4-on-SHEET-D-shows-the-floor-plan-of-a-store-room-on-scale-1-:-50-NSC Civil Technology Construction-Question 6-2017-Paper 1.png

Make neat sketches to illustrate the following symbols: 6.2.1 Water closet 6.2.2 Sink 6.2.3 Water meter 6.3 In which working drawing is the entrance to a site in... show full transcript

Worked Solution & Example Answer:Make neat sketches to illustrate the following symbols: 6.2.1 Water closet 6.2.2 Sink 6.2.3 Water meter 6.3 In which working drawing is the entrance to a site indicated? 6.4 FIGURE 6.4 on SHEET D shows the floor plan of a store room on scale 1 : 50 - NSC Civil Technology Construction - Question 6 - 2017 - Paper 1

Step 1

Responsibilities of the architect

96%

114 rated

Answer

  1. Determine the needs of the owners.
  2. Determine the arrangement of rooms.
  3. Determine arrangement of windows and doors.
  4. Show outside views.

Step 2

6.2.1 Water closet

99%

104 rated

Answer

Below is a neat sketch representing a water closet, which typically includes a cistern and bowl:

Water Closet Sketch

Step 3

6.2.2 Sink

96%

101 rated

Answer

Here is a sketch of a sink, showing the basin and faucet:

Sink Sketch

Step 4

6.2.3 Water meter

98%

120 rated

Answer

The following sketch illustrates a water meter:

Water Meter Sketch

Step 5

6.3 In which working drawing is the entrance to a site indicated?

97%

117 rated

Answer

The entrance to a site is typically indicated in the site plan.

Step 6

6.4

97%

121 rated

Answer

Using the given information to draw the south elevation on SHEET D:

  1. Start by marking the floor level at 200 mm above the ground level.
  2. Mark the wall height as 2600 mm.
  3. Position the window (600 x 200 mm) and door (1400 x 210 mm) according to the floor plan.
  4. Include the door knob placement.
  5. Draw the hipped roof with a pitch of 30° from the indicated construction line.
  6. Ensure the gable end is at the east elevation as specified.

Join the NSC students using SimpleStudy...

97% of Students

Report Improved Results

98% of Students

Recommend to friends

100,000+

Students Supported

1 Million+

Questions answered

;