4.1 Choose a description from COLUMN B that matches an item in COLUMN A. Write only the letter (A–L) next to the question numbers (4.1.1 to 4.1.8) in the ANSWER BOOK... show full transcript

Worked Solution & Example Answer:4.1 Choose a description from COLUMN B that matches an item in COLUMN A - NSC Civil Technology Construction - Question 4 - 2023 - Paper 1

Step 1

4.1.1 Soffit board

96%

114 rated

Answer

K: The soffit board is a component that serves as a functional and aesthetic element in construction, particularly in ceiling work.

Step 2

4.1.2 Cleat

99%

104 rated

Answer

C: A cleat is used to secure and support other components of formwork.

Step 3

4.1.3 Tie

96%

101 rated

Answer

I: A tie prevents the top of shutter board sides from deforming.

Step 4

4.1.4 Brace/Strut

98%

120 rated

Answer

G: A brace/strut is a diagonal member of formwork that provides stability.

Step 5

4.1.5 Fixing plate

97%

117 rated

Answer

F: A fixing plate is a component that helps secure other elements within the formwork assembly.

Step 6

4.1.6 Props

97%

121 rated

Answer

A: Props are vertical supports used to hold up works in progress.

Step 7

4.1.7 Folding wedges

96%

114 rated

Answer

D: Folding wedges are employed to create a slight angle or space in the formwork.

Step 8

4.1.8 Releasing oil/Form oil

99%

104 rated

Answer

B: Releasing oil is applied to the outside of the formwork for striking.

Step 9

4.2.1 Galvanised sheet metal

96%

101 rated

Answer

Galvanised sheet metal protects metal against corrosion by having a layer of zinc.

Step 10

4.2.2 Low-carbon steel

98%

120 rated

Answer

Low-carbon steel is known for its fine smooth appearance and ability to be easily welded.

Step 11

4.2.3 High-carbon steel

97%

117 rated

Answer

High-carbon steel is characterized by its increased strength and hardness.

Step 12

4.3 Name THREE methods of fixing cladding to a wall.

97%

121 rated

Answer

  1. Adhesive fixing
  2. Face fixing
  3. Proprietary fixing

Step 13

4.4.1 Name the type of test that was carried out on the concrete.

96%

114 rated

Answer

The test carried out on the concrete is known as a slump test.

Step 14

4.4.2 Identify the outcome of the test.

99%

104 rated

Answer

The outcome of the test is a true slump.

Step 15

4.4.3 Explain the reason for the outcome.

96%

101 rated

Answer

The reason for this outcome is that the correct amount of water was used for mixing the concrete.

Step 16

4.5 Name THREE services that should be located before excavations start.

98%

120 rated

Answer

  1. Electrical cables
  2. Water pipes
  3. Gas lines

Step 17

4.6 Predict what would happen if heavy rain occurs during the excavation of a trench.

97%

117 rated

Answer

Heavy rains can cause the excavation to collapse, leading to mudslides and making the trench slippery.

Step 18

4.7 Explain why a worker is not allowed to work alone in an excavation.

97%

121 rated

Answer

A worker is not allowed to work alone because it is a safety risk; no one will be there to help in case of an emergency.

Step 19

4.8.1 Identify this machine.

96%

114 rated

Answer

The machine is a plate compactor.

Step 20

4.8.2 Describe how you should operate this construction machine without injuring yourself.

99%

104 rated

Answer

When operating the machine, ensure to wear appropriate personal protective equipment (PPE), maintain a firm stance, and avoid placing hands or feet near moving parts.

Join the NSC students using SimpleStudy...

97% of Students

Report Improved Results

98% of Students

Recommend to friends

100,000+

Students Supported

1 Million+

Questions answered

;