Give ONE word/term for each of the following descriptions - NSC Civil Technology Construction - Question 1 - 2022 - Paper 1
Question 1
Give ONE word/term for each of the following descriptions. Write only the word next to the question numbers (1.1.1 to 1.1.5) in the ANSWER BOOK, e.g. 1.6 preservativ... show full transcript
Worked Solution & Example Answer:Give ONE word/term for each of the following descriptions - NSC Civil Technology Construction - Question 1 - 2022 - Paper 1
Step 1
1.1.1 Can be melted again because no chemical process is involved
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Thermo plastic or Thermo plastic powder coating.
Step 2
1.1.2 The coating of a metal by using the process of electrolysis
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Electroplating.
Step 3
1.1.3 The process of keeping freshly cast concrete moist/damp for a specific period
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Curing.
Step 4
1.1.4 Available in a matt and gloss finish
98%
120 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Paint or Varnish.
Step 5
1.1.5 A process used to coat steel with a layer of zinc
97%
117 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Galvanising.
Step 6
1.2.1 Why should non-skid material be fitted to the bottom end of the stiles of a ladder?
97%
121 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Non-skid material should be fitted to prevent ladders from moving when workers are using them and to ensure stability of the ladder when in use.
Step 7
1.2.2 Explain why it is better to use a wooden ladder when working near electrical cables.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Wooden ladders are better because they prevent electrical shock, as wood is a poor conductor of electricity.
Step 8
1.2.3 Explain why you would prefer to use an aluminium ladder instead of a wooden ladder.
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Aluminium ladders are preferred because they are lighter, more durable, easier to handle, easier to clean, and can extend to higher heights.
Step 9
1.2.4 Name TWO methods that can be used to treat wooden ladders.
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Wooden ladders can be treated with Linseed Oil, Clear varnish, or Wood preservative.
Step 10
1.3 Describe TWO safety regulations that a scaffold platform must adhere to.
98%
120 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
A scaffold platform must have guard rails and toe boards. Additionally, it should be free of any obstruction or waste that could cause injury.
Step 11
1.4 Name TWO places on a building site where safety nets should be erected to ensure the safety of the workers.
97%
117 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Safety nets should be erected above entrances and at passages where persons work while being performed above them.
Step 12
1.5.1 Identify the joining fixture.
97%
121 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The joining fixture is a Rawlbolt or Anchor bolt.
Step 13
1.5.2 Explain the first THREE steps you would follow to attach a bracket to a brick wall by using the fixture above after the position of the hole has been marked.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
The first steps are to drill a hole into the brick wall, remove any debris or clean the hole, and then insert the bolt and secure the shield.
Step 14
1.6 Complete in your ANSWER BOOK the information in the table below by indicating ONE use and ONE way to care for the tool.
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
Dumpy level is used to determine levels and distances. Protect the dumpy level by keeping it in a safe place and ensuring it is not bumped or dropped.