FIGURE 1.1 below is an illustration of a worker on a building site. Describe TWO safety precautions that the worker should follow to prevent what is happening in the... show full transcript

Worked Solution & Example Answer:FIGURE 1.1 below is an illustration of a worker on a building site - NSC Civil Technology Woodworking - Question 1 - 2017 - Paper 1

Step 1

Explain why electric cables and the wires of power tools must be checked regularly.

96%

114 rated

Answer

Electric cables and wires must be checked regularly to prevent electric shock. Any frayed or damaged wires can expose live wires, creating a risk of electrocution or fire hazards.

Step 2

Give ONE reason why it is NOT safe to adjust a machine while the blade is in motion (turning).

99%

104 rated

Answer

It is not safe to adjust a machine while the blade is in motion because the worker can be injured by the moving blade, leading to severe injuries or potential amputations.

Step 3

Name THREE accessories (equipment) that you need to conduct a slump test.

96%

101 rated

Answer

To conduct a slump test, you need a slump cone, a base plate, and a measuring rod (tamping rod).

Step 4

Recommend ONE method of mixing concrete for bigger projects.

98%

120 rated

Answer

For larger projects, a concrete mixer or machine mixed concrete is recommended, as it ensures a consistent mix and saves time compared to manual mixing.

Step 5

Choose a description from COLUMN B that matches an item in COLUMN A.

97%

117 rated

Answer

1.6.1 L - Plywood: A finishing applied to wood to make it durable. 1.6.2 J - Hardboard: Used for dry walls and ceilings. 1.6.3 K - Corrugated iron sheeting: Can be cast into any shape when wet. 1.6.4 E - Mild Steel: Ferrous metal that corrodes easily. 1.6.5 A - PVC (polyvinyl chloride): Used for making electrical conduits. 1.6.6 G - Gypsum board: Used to make formwork. 1.6.7 H - Concrete: Mixture of cement, crushed stone and water. 1.6.8 D - DPC (damp-proof course): Prevents moisture from moving upwards on walls. 1.6.9 I - Powder coating: Applied with a spray gun as a free-flowing dry powder. 1.6.10 M - Varnish: Malleable and ductile.

Step 6

Describe ONE type of equipment that can be used to apply paint to a ceiling.

97%

121 rated

Answer

A roller can be used to apply paint to a ceiling. It provides a smooth finish and allows for quicker coverage compared to using a brush.

Step 7

Give ONE reason for your answer to QUESTION 1.9.1.

96%

114 rated

Answer

Using a roller is quicker than using a brush, as it covers larger areas in less time and ensures an even application of paint.

Step 8

Name the components (materials) used to close the gap/opening between the following:

99%

104 rated

Answer

1.10.1 Floor covering: Skirting/tile skirting. 1.10.2 Wall and ceiling of a building: Cornice.