Photo AI

3.1 South Africa experienced a shortage of raw sugar resulting from various challenges that made it difficult for farmers to efficiently grow sugar cane - NSC Maritime Economics - Question 3 - 2024 - Paper 1

Question icon

Question 3

3.1-South-Africa-experienced-a-shortage-of-raw-sugar-resulting-from-various-challenges-that-made-it-difficult-for-farmers-to-efficiently-grow-sugar-cane-NSC Maritime Economics-Question 3-2024-Paper 1.png

3.1 South Africa experienced a shortage of raw sugar resulting from various challenges that made it difficult for farmers to efficiently grow sugar cane. Consequentl... show full transcript

Worked Solution & Example Answer:3.1 South Africa experienced a shortage of raw sugar resulting from various challenges that made it difficult for farmers to efficiently grow sugar cane - NSC Maritime Economics - Question 3 - 2024 - Paper 1

Step 1

30 000 tons of total cargo of raw sugar was shipped at a time. How many shipments were there in total to move all the cargo?

96%

114 rated

Answer

To determine the total number of shipments required to move all the cargo, we can use the formula:

ext{Total shipments} = rac{ ext{Total cargo}}{ ext{Cargo per shipment}} = rac{720000 ext{ tons}}{30000 ext{ tons per shipment}} = 24 ext{ shipments}

Step 2

Four bulk carriers each loaded one consignment. How many loaded voyages will each ship have to make to move all the cargo?

99%

104 rated

Answer

Each ship is responsible for carrying an equal share of the total cargo. Since there are four bulk carriers:

ext{Shipments per carrier} = rac{ ext{Total shipments}}{ ext{Number of carriers}} = rac{24}{4} = 6 ext{ shipments per ship}

Step 3

Which insurance will cover the cargo of sugar when enroute to Durban?

96%

101 rated

Answer

The cargo insurance that would typically cover the movement of sugar while enroute to Durban is H&M (Hull & Machinery) insurance.

Step 4

What type of bulk carrier is she? TWO PARTS TO YOUR ANSWER.

98%

120 rated

Answer

MV Petra is categorized as a geared bulk carrier, which means that it has its own cargo-handling gear (cranes) onboard, making it suitable for ports with limited shore facilities.

Step 5

How old is she now?

97%

117 rated

Answer

As MV Petra was built in 2007, if we consider the current year to be 2023, she is 16 years old.

Step 6

Will the freight rates of a newer ship with same dimensions be more or less than that of MV Petra?

97%

121 rated

Answer

The freight rates for a newer ship that has the same dimensions are likely to be more than those for MV Petra due to various factors including improvements in fuel efficiency, technology, and overall market demand.

Step 7

Giving a reason for your answer, would you call her a 'flag of convenience' ship?

96%

114 rated

Answer

Yes, I would consider MV Petra a 'flag of convenience' ship because it is registered in Liberia while being owned in Japan, which often allows for more favorable tax and regulatory conditions compared to the owner's home country.

Step 8

Name FOUR countries with a big register of ships.

99%

104 rated

Answer

Countries known for having a significant ship register include Panama, Liberia, Marshall Islands, and Singapore.

Step 9

How would the availability of more commercial ships on the nation’s ship register benefit South Africa? Mention THREE points.

96%

101 rated

Answer

  1. Enhanced maritime trade and connectivity for South Africa.
  2. Increased government revenue through taxes and fees associated with ship registration.
  3. Promotes local shipping and maritime industries, leading to job creation.

Step 10

Why must the holds be swept and dry before arrival in port?

98%

120 rated

Answer

The holds must be swept and dry to prevent contamination of the cargo during transport, ensuring that no residual substances affect the quality of the new cargo. This is also essential for maintaining hygiene standards in port.

Step 11

The master requested 'voyage instructions'. What are voyage instructions?

97%

117 rated

Answer

Voyage instructions are a set of formal guidelines given to the captain that specify the details of the voyage, including the route to be taken, port calls, and any relevant port regulations or operational procedures.

Step 12

According to which IMO convention/code did the master provide the last ten ports of call?

97%

121 rated

Answer

The master must provide the last ten ports of call according to the International Maritime Organization (IMO) regulations.

Step 13

What arrangement did the agent have to make before she arrived?

96%

114 rated

Answer

The agent would need to arrange for a berth booking, organize the loading of stores, and engage surveyors to inspect the ship, as well as inform various government agencies about the ship's arrival.

Step 14

Which government organisation would the agent have to check with regards to the seafarer signing Barnes who had to sign off?

99%

104 rated

Answer

The agent would need to check with the Department of Home Affairs or a similar regulatory body that oversees seafarer documentation and immigration matters.

Step 15

How many hours did it take to load all the cargo, including 6 hours of break? ROUND OFF TO THE NEXT HOUR.

96%

101 rated

Answer

Total loading time includes 90 hours (scheduled) plus 6 hours of break. Thus, the total loading time is:

extTotalloadingtime=90+6=96exthours ext{Total loading time} = 90 + 6 = 96 ext{ hours}

Step 16

When was the loading of sugar completed?

98%

120 rated

Answer

The loading of sugar was completed 90 hours after it started on October 1st, leading to a completion time of approximately October 3rd.

Step 17

Assume that outward clearance took four hours. What was her ETD from Port of Santos?

97%

117 rated

Answer

Assuming the loading was completed at noon on October 3rd, the outward clearance taking four hours would make the estimated time of departure (ETD):

extETD=extLoadingcompletion+extClearancetime=12:00exton3rdOctober+4exthours=16:00exton3rdOctober ext{ETD} = ext{Loading completion} + ext{Clearance time} = 12:00 ext{ on } 3rd October + 4 ext{ hours} = 16:00 ext{ on } 3rd October

Step 18

What is the proper name for these 90 hours?

97%

121 rated

Answer

The proper name for these 90 hours is 'laytime'.

Step 19

From which document will this loading period be stipulated?

96%

114 rated

Answer

The loading period is typically stipulated in the charter party agreement.

Step 20

Did MV Petra take more or less than agreed time to load?

99%

104 rated

Answer

MV Petra took less than the agreed time to load, which was 90 hours.

Step 21

Was demurrage or dispatch payable?

96%

101 rated

Answer

Dispatch is payable since MV Petra completed her loading in less time than the stipulated laytime.

Step 22

Did the master of MV Petra employ the salvage tug to a Lloyd’s Open Form agreement? Answer YES or NO.

98%

120 rated

Answer

YES.

Step 23

Give a reason for your answer in Question 3.5.1.

97%

117 rated

Answer

A Lloyd’s Open Form agreement would allow the master to secure assistance without having to negotiate the terms at the time of the incident.

Step 24

Besides her flag state, what is the name of the other organisation that declared her seaworthy after her repair in Cape Town?

97%

121 rated

Answer

The other organization that would declare MV Petra seaworthy after repair is the International Maritime Organization (IMO) or a similar classification society.

Step 25

Could the owners of MV Petra declare general average following this incident?

96%

114 rated

Answer

Yes, the owners could declare general average as the accident incurred damages affecting the entire cargo and the ship’s value.

Step 26

What do we call a place where ships undergo hull repairs, out of the water?

99%

104 rated

Answer

Such a place is called a dry dock.

Join the NSC students using SimpleStudy...

97% of Students

Report Improved Results

98% of Students

Recommend to friends

100,000+

Students Supported

1 Million+

Questions answered

;