Photo AI

African Concrete Blocks is a company that manufactures square concrete blocks - NSC Mathematical Literacy - Question 3 - 2019 - Paper 1

Question icon

Question 3

African-Concrete-Blocks-is-a-company-that-manufactures-square-concrete-blocks-NSC Mathematical Literacy-Question 3-2019-Paper 1.png

African Concrete Blocks is a company that manufactures square concrete blocks. The diagram below shows the six steel moulds that they use to make the square concrete... show full transcript

Worked Solution & Example Answer:African Concrete Blocks is a company that manufactures square concrete blocks - NSC Mathematical Literacy - Question 3 - 2019 - Paper 1

Step 1

Explain the meaning of volume.

96%

114 rated

Answer

Volume is the measure of the three-dimensional space occupied by a solid or liquid. It quantifies the capacity of an object, indicating how much space is contained within a given boundary.

Step 2

Calculate (in m³) the volume of ONE concrete block.

99%

104 rated

Answer

To find the volume of one concrete block, we will use the formula:

extVolume=extsideimesextsideimesextheight ext{Volume} = ext{side} imes ext{side} imes ext{height}

Given that the side length is 50 cm (0.5 m) and the height is 180 mm (0.18 m), we can perform the calculation as follows:

extVolume=0.5imes0.5imes0.18=0.045extm3 ext{Volume} = 0.5 imes 0.5 imes 0.18 = 0.045 ext{ m}^3

Step 3

Calculate (in m²) the total area of the 12 concrete blocks.

96%

101 rated

Answer

Firstly, calculate the area of one concrete block using the formula:

ext{Area} = ext{side} imes ext{side}\

For one block:

extArea=0.5imes0.5=0.25extm2 ext{Area} = 0.5 imes 0.5 = 0.25 ext{ m}^2

Now, for 12 blocks:

extTotalArea=12imes0.25=3extm2 ext{Total Area} = 12 imes 0.25 = 3 ext{ m}^2

Step 4

Calculate the area of the walkway that needs to be covered with pebbles.

98%

120 rated

Answer

Using the formula for the area of the walkway:

ext{Area} = ext{length} imes ext{breadth}\

Given that the dimensions are 4.05 m and 1.45 m:

extArea=4.05imes1.45=5.8725extm2 ext{Area} = 4.05 imes 1.45 = 5.8725 ext{ m}^2

Step 5

Calculate the total number of bags of pebbles needed to cover an area of 5.7 m².

97%

117 rated

Answer

The area that needs to be covered with pebbles is:

extAreatobecovered=extTotalareaofwalkwayextAreaofconcreteblocks ext{Area to be covered} = ext{Total area of walkway} - ext{Area of concrete blocks}

From previous calculations:

extAreatobecovered=5.87253=2.8725extm2 ext{Area to be covered} = 5.8725 - 3 = 2.8725 ext{ m}^2

Now, if one bag covers 0.36 m², the total number of bags required is:

extNumberofbags=2.87250.36extbags7.98 bags8extbags(roundingup) ext{Number of bags} = \frac{2.8725}{0.36} ext{ bags} \approx 7.98 \text{ bags} \approx 8 ext{ bags (rounding up)}

Join the NSC students using SimpleStudy...

97% of Students

Report Improved Results

98% of Students

Recommend to friends

100,000+

Students Supported

1 Million+

Questions answered

;