Photo AI

A training company wants to know if there is a link between the hours spent in training by a particular category of employee and their productivity (units produced per day) - NSC Mathematics - Question 1 - 2017 - Paper 2

Question icon

Question 1

A-training-company-wants-to-know-if-there-is-a-link-between-the-hours-spent-in-training-by-a-particular-category-of-employee-and-their-productivity-(units-produced-per-day)-NSC Mathematics-Question 1-2017-Paper 2.png

A training company wants to know if there is a link between the hours spent in training by a particular category of employee and their productivity (units produced p... show full transcript

Worked Solution & Example Answer:A training company wants to know if there is a link between the hours spent in training by a particular category of employee and their productivity (units produced per day) - NSC Mathematics - Question 1 - 2017 - Paper 2

Step 1

1.1 Draw a scatter plot of the data on the grid provided in the ANSWER BOOK.

96%

114 rated

Answer

To create a scatter plot, plot the hours in training on the x-axis and productivity units produced per day on the y-axis, using the given data points for each employee. Ensure that each point is correctly placed according to the training hours and corresponding productivity.

Step 2

1.2 Determine the equation of the least squares regression line.

99%

104 rated

Answer

The least squares regression equation can be expressed as:

y = a + bx

Where:

  • a (y-intercept) is approximately 29.22
  • b (slope) is approximately 0.89

Thus, the equation can be represented as:

y = 29.22 + 0.89x

Step 3

1.3 Draw the least squares regression line on the scatter plot drawn in QUESTION 1.1.

96%

101 rated

Answer

Plot the least squares regression line using the equation derived. The line should ideally pass through the points calculated from the regression equation to visually represent the trend of productivity based on training hours.

Step 4

1.4 Use the least squares regression line to predict the productivity (units produced per day), if a particular category of employee spent 25 hours in training.

98%

120 rated

Answer

Substituting 25 into the regression equation:

y = 29.22 + 0.89(25)

y = 29.22 + 22.25 = 51.47

Therefore, the predicted productivity for 25 training hours is approximately 51.47 units per day.

Step 5

1.5 Determine the correlation coefficient of the data.

97%

117 rated

Answer

The correlation coefficient, denoted as r, is 0.66. This suggests a moderately strong positive correlation between the hours spent in training and the productivity.

Step 6

1.6 Comment on the strength of relationship between the hours spent in training and the number of units produced per day.

97%

121 rated

Answer

There is a moderately strong positive correlation between the hours spent in training and productivity, indicating that as training hours increase, productivity tends to increase as well. However, there are variations that suggest other factors may also influence productivity.

Join the NSC students using SimpleStudy...

97% of Students

Report Improved Results

98% of Students

Recommend to friends

100,000+

Students Supported

1 Million+

Questions answered

;