Photo AI
Question 10
Minimising heat loss and storing heat gain are important considerations in Passive House design. Using notes and freehand sketches, show best practice design detaili... show full transcript
Step 1
Answer
To minimise heat loss in the foundations of a Passive House, a passive foundation system should achieve a U-value of between 0.10 - 0.15 W/m²K. Important considerations include:
Step 2
Answer
For the ground floor, increasing the thickness of the screed and tile finish enhances the capacity to absorb and retain heat. Effective practices include:
Step 3
Answer
Overheating in a Passive House typically occurs due to:
Passive Solar Gain: Overheating arises when interior temperatures exceed a comfortable level, particularly when passive solar design does not account for summer conditions.
Inadequate Thermal Mass: If the thermal mass is insufficient or not designed properly, it will not absorb and release the heat effectively, leading to discomfort during hot months.
Step 4
Answer
To mitigate overheating, consider the following design features:
Extended Roof Overhangs: This feature reduces direct solar gain by providing shade during summer while allowing sunlight in during winter months.
Dynamic Glazing Systems: These systems can adjust tint in response to environmental conditions, effectively managing solar heat gain and maintaining comfortable indoor temperatures.
Step 5
Answer
Low Energy Consumption: A typical Passive House uses about 75% less energy compared to similar buildings, significantly reducing energy bills and reliance on fossil fuels.
Comfort Consistency: Passive House design provides consistent indoor temperatures, enhancing occupant comfort throughout the year.
Step 6
Answer
High Initial Cost: Construction materials and workmanship required for Passive Houses can be expensive, leading to higher upfront costs for builders and homeowners.
Training Requirements: Significant training and expertise are necessary for designers and construction teams, which may result in limited availability of qualified professionals, thereby delaying projects.
Report Improved Results
Recommend to friends
Students Supported
Questions answered