Fig. B-1 shows the plan and elevation (excluding hidden detail) of the structure - Leaving Cert DCG - Question B-1 - 2013
Question B-1
Fig. B-1 shows the plan and elevation (excluding hidden detail) of the structure.
(a) Draw the given plan and elevation of the structure.
(b) Determine the dihedra... show full transcript
Worked Solution & Example Answer:Fig. B-1 shows the plan and elevation (excluding hidden detail) of the structure - Leaving Cert DCG - Question B-1 - 2013
Step 1
Draw the given plan and elevation of the structure.
96%
114 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
To draw the plan and elevation of the Fountain Place structure:
The plan view should be oriented so that surface A is on the left side, with surface B in the center, and surface C to the right.
The elevation shows the height of each surface, with surface A being the tallest, followed by surface B and then surface C.
Clearly label all sides and dimensions as given, ensuring the angles between planes A and B are properly depicted.
Step 2
Determine the dihedral angle between the planes A and B.
99%
104 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
To find the dihedral angle between planes A and B:
Identify the normal vectors for both plane A and plane B, based on their surface orientations.
Use the formula:
heta = ext{arccos} rac{ extbf{n}_A ullet extbf{n}_B}{| extbf{n}_A| | extbf{n}_B|}
where extbfnA and extbfnB are the normal vectors.
Calculate the angle heta which represents the dihedral angle between the two planes.
Step 3
Determine the true shape of surface A.
96%
101 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
To determine the true shape of surface A:
Project the outline of surface A onto a horizontal plane to see its true dimensions.
Use the rabatment method to unfold the shape, allowing for accurate measurement and depiction.
Ensure that elevations and angles are consistent with the plan view, retaining all scale and projection standards.
Step 4
Determine the projections of movement path (d).
98%
120 rated
Only available for registered users.
Sign up now to view full answer, or log in if you already have an account!
Answer
To find the projections of the stuntman's movement path:
Start from point S which is on surface A.
Trace the path down to the intersection of surfaces A and B, marking the location of this line.
From this intersection, determine the inclination of the path down to surface B and indicate its completion on both elevation and plan views.
Continue from surface B to surface C, repeating the projection process for the shortest distance down to the ground.
Join the Leaving Cert students using SimpleStudy...