Earthworks for Inclined Roads (Leaving Cert DCG): Quizzes

📚Quizzes
Earthworks for Inclined Roads
Sign up to keep practising.Create a free account to play more quizzes and track your progress.

Practise the questions

10 questions from this quiz

Show

What does earthworks refer to in road construction?

Moving, removing & placing soil/rock

Where are fill cones drawn when plotting for a sloping road?

At high end where ground below formation

Where are cut cones typically drawn for a sloping road?

At low end where ground above formation

What does a side slope ratio of 1:1.51:1.5 mean?

1m vertical, 1.5m horizontal

What are typical formation widths for roads?

6m, 8m, or 12m

If formation = 120m, ground = 115m, side slope 1:1.51:1.5, what is horizontal distance?

7.5m

Why is balancing cut and fill operations important?

Minimises material transport costs

Why is proper drainage critical in cut areas?

Prevents water accumulation & instability

What is the common side slope ratio for embankments?

1:1.51:1.5

What can material removed from cut areas be used for?

Fill operations elsewhere on project

Explore Leaving Cert DCG Revision Notes by Topics

Explore Leaving Cert DCG Model Answers by Topics

Explore Leaving Cert DCG Flashcards by Topics

Explore Leaving Cert DCG Exam Questions by Topics

Join 100,000+ Leaving Cert students studying Quizzes with us.

Select your subjects, and get access to A+ resources today.