When should actual landscaping work commence on a building site?
When should actual landscaping work commence on a building site?
After main structure is completed
What is the required clear sightline distance in each direction from a site entrance?
What is the required clear sightline distance in each direction from a site entrance?
45 metres
Which entranceway type curves inward from the road?
Which entranceway type curves inward from the road?
Concave entranceway
What should landscaping provide for future occupants?
What should landscaping provide for future occupants?
Shelter and privacy
What type of plants should be used when landscaping rural sites?
What type of plants should be used when landscaping rural sites?
Native species
What is the minimum width required at the narrowest point of an entranceway?
What is the minimum width required at the narrowest point of an entranceway?
3 metres
What approach works best for rural area landscaping?
What approach works best for rural area landscaping?
Natural, organic approaches
What splay angle is required for entranceways?
What splay angle is required for entranceways?
45-degree angle
What demonstrates good integration with surroundings?
What demonstrates good integration with surroundings?
Maintaining natural cover
What is the minimum distance required from the main road for an entranceway?
What is the minimum distance required from the main road for an entranceway?
5 metres