Internal Walls (Leaving Cert Construction Studies): Quizzes

📚Quizzes
Internal Walls
Sign up to keep practising.Create a free account to play more quizzes and track your progress.

Practise the questions

10 questions from this quiz

Show

What is the primary role of load-bearing internal walls?

Support floors and roofs above

What is the minimum fire resistance time required for partition walls?

30 minutes

How do internal block walls connect to external walls?

Through wall ties

What is the purpose of a timber wall plate on top of an internal block wall?

Spread load from floor above

What is the first step in installing electrical services in block walls?

Chasing a groove

What spacing is used for studs in timber internal walls?

400mm centres

How many rows of noggins are required in load-bearing timber walls?

Double row

Where are non-load-bearing timber walls built?

Directly on floor surface

Where must holes be drilled when running services through timber studs?

Along the centre line

What is plasterboard made from?

Gypsum plaster between paper sheets

Explore Leaving Cert Construction Studies Revision Notes by Topics

Explore Leaving Cert Construction Studies Model Answers by Topics

Explore Leaving Cert Construction Studies Flashcards by Topics

Explore Leaving Cert Construction Studies Exam Questions by Topics

Join 100,000+ Leaving Cert students studying Quizzes with us.

Select your subjects, and get access to A+ resources today.