Soil Investigation (Leaving Cert Construction Studies): Quizzes

📚Quizzes
Soil Investigation
Sign up to keep practising.Create a free account to play more quizzes and track your progress.

Practise the questions

10 questions from this quiz

Show

Which three main aspects of construction are influenced by soil type on a building site?

Foundation, septic tank, surface drainage

Who carries out professional soil testing to determine soil type and suitability for building?

A qualified land surveyor

Which plants indicate good soil conditions on a greenfield site?

Thistle, bracken, and ragwort

What are the typical dimensions of trial holes dug for dwelling construction?

1m by 1m, 2.5-4m deep

What is the bearing capacity of compacted sand?

Over 600 kN/m2600 \text{ kN/m}^2

Below what bearing capacity can soil be moulded by hand, indicating poor load-bearing properties?

Under 150 kN/m2150 \text{ kN/m}^2

What water depth in a trial hole makes a site unsuitable for building?

Exceeding 1m

What range must the percolation value fall between for a site to pass the percolation test?

Between 5 and 60

What is the minimum time period required for percolation testing?

At least two days

What is the bearing capacity of peat, and is it suitable for building?

Under 75 kN/m275 \text{ kN/m}^2, not suitable

Explore Leaving Cert Construction Studies Revision Notes by Topics

Explore Leaving Cert Construction Studies Model Answers by Topics

Explore Leaving Cert Construction Studies Flashcards by Topics

Explore Leaving Cert Construction Studies Exam Questions by Topics

Join 100,000+ Leaving Cert students studying Quizzes with us.

Select your subjects, and get access to A+ resources today.